1/5 < >

Capricorn-Brücke Medienhafen, Düsseldorf

New Building, Bridge

Owner: Pirol Holzstraße GmbH & Co. KG, Düsseldorf
Architect: Gatermann + Schossig Architekten GmbH, Köln

Performance: Structural Design, Building physics
Work Phases: 1-6

Completion: 2020

Osd is commissioned with the structural design (quality management of the glas fabrication, static of the glas construction) and the building physics (thermal property, building acoustics, thermal simulation).

Capricorn Bridge, 2019 (GATERMANN + SCHOSSIG Architekten)

Foto

view (Gatermann + Schossig/rendering Fix Visuals)

Foto

structural analysis (graphic osd)

Foto

Fabrication of the steel elements at seele pilsen s.r.o., Plzen - CZ (photo osd)

Foto

steel construction of the carrier (photo osd)

Foto